news

In the new year ,CAMPIU company have invested a lot in the production conditions.

NewsDate:2010-04-12 Hit:103

New Equipment:
1. 1 set of S. Korea milling machine:
2. Import 2 set precision numerically controlled machine from JAPAN
3. Purchasing 4 new plastic injecting machines.
4. Increase 4 set of Automatic winding machines.
And the total capacity reaches 120,000 PCS/month

We have established a free dust room in the ground floor, and increase some key machines.
And the second floor have been established as a workshop, is a free dust assembly line, Which is anti-static.Implement TS Management.

Lab Center
We have set up a high stand lab center in second floor; we strictly implement the standard as the FAW group. (Salt-spray test, Temperature test, vibration & Durability test.)

googleƹ sosoƹ seoŻ